Tag: allocation

Fixed allocation

By using fix allocation, it is possible to assign a fixed number of trucks to each loader. In this situation, the number of trucks works with each loader may not change. Allocation pattern can be altered in case of loader breakdown or change in operation plan. In this part of the program, allocations are demonstrated schematically, and therefore, trucks’ location can be identified at a glance.